ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE VAULT PERMIT AT THE SAME LOCATION (EITHER PERMIT TYPE 117,107 OR 106). The canopy maintenance permit is from the "07" Canopy Permit series; the specific permit type to be applied for depends on the land use to which the canopy is being attached. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT TRAFFIC OPERATIONS DIVISION TO OBTAIN THE RESTORATION PLANS FOR THIS ROADWAY INCLUDING COLOR MARKINGS AND ANY OTHER INSTALLATION REQUIRED. WITH NYCDOT MILLING AND PAVING OPERATION. CRITERIA & PROTOTYPE FOUND AT: THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB LANE ONLY RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. The installation and repair of this infrastructure is crucial to maintaining and strengthening the city's competitive position in the global economy. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. NYC Parks & Recreation Fax: 212-720-3488, Queens SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. (212) 839-4700 Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. Freeway, about 619-001: Temporary Positive Barrier (6 Sheets), about 619-002: Type III Construction Barricades (2 Sheets), about 619-004: Portable Temporary Wooden Sign Support, about 619-005: Details on Placement of Portable Temporary Rumble Strips, about 619-010: Work Zone Traffic Control General Notes, about 619-011: Work Zone Traffic Control General Tables & Legend, about 619-022: Shoulder Closure/Lane Encroachment, Official Electronic Standard Specifications and Standard Sheets website, 619-001: Temporary Positive Barrier (6 Sheets), 619-002: Type III Construction Barricades (2 Sheets), 619-004: Portable Temporary Wooden Sign Support, 619-005: Details on Placement of Portable Temporary Rumble Strips, 619-010: Work Zone Traffic Control General Notes, 619-011: Work Zone Traffic Control General Tables & Legend, 619-022: Shoulder Closure/Lane Encroachment. NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. Further information is available in Section 2-02 (c) of Highway Rules. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which CARs may be issued.). Fax: 718-596-2609, Central Office IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). Customer Service: (718) 802-3675, Manhattan If all the documentation is accepted, pre-determined permit stipulations are added to the permit and the application is sent for processing. All materials used for backfill must be free from bricks, blocks, excavated pavement materials and/or organic material or other debris. Coordinating street work in accordance with the principles of this section will help to minimize delays and disruption to road users, businesses and residents and help extend the useful life of city streets. NYC DOT hosts borough-level meetings to discuss the scheduling of upcoming resurfacing projects with utility companies and other potential street excavators. StatenIsland.Forestry@parks.nyc.gov PRIOR TO PERFORMING ANY NON-EMERGENCY WORK WHICH IMPACTS AUTHORIZED PARKING, THE CONTRACTOR SHALL NOTIFY & COORDINATE WITH NYC DOT AUTHORIZED PARKING UNIT AT: BARCLAYS CENTER (ATLANTIC YARDS) EVENTS. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. This number should be kept confidential and only used to apply for NYC DOT permits. These are in addition to the "Common Requirements" listed at the beginning of this section. OCCUPY ONE 11 FOOT LANE 10 PM TO 12 PM NIGHTLY. Fax: (718) 993-3077. Print his/her name and title and provide a signature. Access the, If the applicant intends to fully close a roadway, a. The Protected Streets Listing consists of four separate files, each covering all five boroughs: All streets on the "Active/Future" lists show the anticipated start date of the project. Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. See Section 3.5.1 Holds for more information. NO NOISY OPERATIONS MAY OCCUR AFTER 10:00 PM. Section 3.5 Other Provisions Pertaining to Permits contains more information on holds. MUST COORDINATE WITH NYPD PRECINCT C.O. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. Canopy permits are generally taken out by building owners, business owners, and canopy installers. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. WORK BEING PERFORMED IS FOR EMERGENCY SIDEWALK REPAIRS DUE TO TORNADOS. View more information on how to respond to Sidewalk Violations. THIS STIP IS USED FOR WORK IN NUMEROUS LANES BUT NOT FOR THE ENTIRE LENGTH OF THE BLOCK. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. EmbargoesNYC DOT imposes construction "embargoes" (a temporary suspension of active permits in the affected area) for significant special events including the New York City Marathon, parades, high profile projects and the winter holiday season. See, Utilize recycled content in paving materials. Permit applications near bridges are subject to approval by the Division of Bridges. MOVEMENT RESTRICTIONS ALONG EXTERIOR STREET WILL BE IN EFFECT DURING ALL SPECIAL EMBARGOS AFFECTING THE AREA SUCH AS THE POPE VISIT AND ALL STAR GAME. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. It draws from a wide range of resources and experience to present a coherent set of choices for street design. Non-Freeway, Special, Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. All of these signs are metal and include the agency name and sign code. SPECIFICATION. The Highway Rules, Section 2-07(c) (4) contains additional information. PERMITTEE MUST CONTACT DOT TRAFFIC & PLANNING OFFICE BY EMAIL AT. To request release of a CON hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. Manhattan check-in window hours extended to 3:30pm for Bronx work only. Worker's Compensation Insurance. NYC DOT coordinates street opening and other construction on streets. USE OF METERED,AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED. United States Department of Transportation, Book of Standards for Highways and Incidental Structures, Construction and Traffic Standard Details, Design Standards and Specifications Drawings, PDF, DGN (freely available login required), PDF, DGN (individual division details also available). Fax: (718) 815-8391. THIS STIP IS USED FOR WORK IN NUMEROUS LANES AND THROUGHOUT THE LENGTH OF A BLOCK. The second permit for canopy maintenance is automatically placed on a. If the hold is not released, the applicant must contact DDC (DDC contact information is available in Appendix D, Other Agency and Utility Contact Information). Applicants may provide complete copies of insurance policies instead of certificates of insurance. Hunters Point Plaza Fax: (212) 788-3086, New York State Department of Environmental Conservation (DEC) Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas Sidewalks in low-rise residential areas should be at least 5 feet wide Wherever possible, sidewalk cross-slope should not be greater than 2% Office hours: 8:30 AM to 5:00 PM, From 7:00 AM to 3:30 PM, Monday to Friday, call: (212) 839-9660/61/62 Street resurfacing in progress. Payment by an applicant of outstanding fines, civil penalties or judgments imposed or entered against such applicant by a court or ECB; Payment by an applicant of outstanding fees or other charges lawfully assessed by NYC DOT against such applicant pursuant to the Highway Rules or other applicable law; and/or, Satisfactory compliance by an applicant with a CAR or order issued by the Commissioner. THIS WORK HAS PRIORITY OVER OTHER NON-EMERGENCY WORK ON STREET SEGMENT. After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. HIQA Central Office To request release of an STP hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. THIS STIP IS USED FOR MULTIPLE CUTS IN A CURB/PARKING LANE AND FOR SINGLE CUTS IN CURB LANES THAT CONVERT TO TRAVEL LANES DURING SPECIFIC HOURS. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Permits that have expired may be reissued only within30 daysof expiration. The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. The area of the sidewalk closest to the curb, where light poles, tree pits and other vegetation, signs, fire hydrants, and street furniture are typically located, is referred to as the furnishing zone.. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. Canopy placement must be adequate for public safety and must be suitable to the circumstances of the proposed canopy location and not interfere with the public use of the sidewalk. Longitudinal SlopeThe longitudinal slope of the sidewalk must be uniform and parallel to the curb at the curb's proper grade. Only in circumstances where the applicant can demonstrate that the work could not have been reasonably anticipated prior to the street resurfacing/reconstruction will an application for a Street Opening Permit on a Protected Street be reviewed. The completed Permittee Registration Application and other required documents must be submitted in person to the NYC DOT central Permit Office to complete the registration process. COORDINATE CONSTRUCTION ACTIVITY WITH THEATRE GROUPS PRIOR TO WORK. Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. Crane placed on the street for construction activity. NYC Parks & Recreation SPECIFICATIONS. APPLICANT SHALL NOT PLACE CONTAINER IN A WAY THAT CONFLICTS WITH OTHER PERMITTED CONSTRUCTION ACTIVITIES ON THE SAME BLOCK.PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. If the proposed work location is in protected street status, the application will automatically be placed on SAM hold for further review. 16 Court Street, 7th Fl. BEVELED SAWCUT IN ROADWAY. This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. Send corrections and additions to the Standard Drawings team. Tel: (718) 482-4516 MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. Department of Transportation. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. THREE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA.PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. AN EMBARGO WILL BE IN EFFECT FOR THIS WORK AREA FROM 7/28/14 THRU 8/16/14 ALL ROADWAY/SIDEWALK OPENINGS WHICH CANNOT BE COMPLETED INCLUDING BACKFILL AND RESTORATION PRIOR TO 7/28/14 SHOULD NOT BE STARTED. Permit Bonds, as described in the Highway Rules, Section 2-02 (a) (4), should cover all permitted activities. BUG Ratings DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Standard Sheets (US Customary) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) US Customary Standard Sheets Standard Sheets are available both in the US Customary units accessible below and in Metric units. LIGHTS MUST BE INSTALLED PRIOR TO 11/16 AND REMOVED BETWEEN 01/02 AND 01/15. SEND RESPONSES TO NYCDOT DIV. Standard Sheets are available both in the US Customary units accessible below and in Metric units. DO NOT PLACE MATERIALS, TRAILERS, CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. A DOB-approved plan must be obtained and submitted to PEU with the application for a final approval and permit. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHEAST QUADRANT OF THE INTERSECTION. The violation provides a property owner 75 daysto make repairs (see the Sidewalk Repairs section above for further details). NYC DOT is working to enhance the coordination of major planned work that impacts the streets with utility companies and other entities that perform street excavations. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. Work Site Safety All obstructions on the street must be protected by barricades, fencing, railing with flags, lights, and/or signs placed at proper intervals and at prescribed hours in accordance with the most recent version of the Manual on Uniform Traffic Control Devices (MUTCD), published by the Federal Highway Administration, and the New York State Supplement. Borough Hall, 2nd Floor Customer Service: (718) 286-0600, Staten Island If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. If a contractor is being used, the contractor must be registered with NYC DOT and must take out the permit. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. DURING NON-WORKING HOURS PEDESTRIAN WALK WAY MUST BE MAINTAINED ON SIDEWALK OR ON ROADWAY. THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. WORK SHALL BE PERFORMED IN ACCORDANCE WITH NYCDOT'S SPECIAL EVENTS OFFICE REQUIREMENTS RELATED TO A SPECIAL EVENT, AS IDENTIFIED IN THEIR EMAIL, WHICH MUST BE KEPT ON-SITE WITH ALL ACTIVE PERMITS WHILE THE APPROVED WORK IS BEING PERFORMED. During the processing of the permit, if there is a hold, the applicant is notified of the type of hold and the steps the applicant must take to release the hold. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR SPECIFIC TRAVEL LANE RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. OCMC will review the project to determine if a Community Reassessment Impact and Amelioration (CRIA) statement must be submitted to NYC DOT. PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED. New York, New York 10041. STANDARD SHEETS (METRIC) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (Metric) > 619 Maintenance and Protection of Traffic Note: Effective May 2017 no new or updated versions of Metric Standard sheets will be published. Fax: (718) 816-9194 More information on this and other "holds" that may be placed on permit applications can be found in, Protected street status for intersections, Active/Future start dates of projects for segments, Active/Future start dates of projects for intersections. 1/2RES-RESTORE AS PER SKETCH #8 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. WORK 7 PM - 6 AM WEEKNIGHTS, NO WEEKENDS. The hold is to review the proposed work and set conditions for the work and/or the street restoration. AS PER STIPULATION MEC04-246 AND PROJECT PLANS DATED 04/30/04 WHICH MUST BE ATTACHED TO PERMIT. All links are subject to change. These are in addition to the "Common Requirements" listed at the beginning of this section. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. If a private homeowner is applying for a Sidewalk Repair Permit, and will be making the repair by himself/herself, the homeowner may apply for a permit by mail. Once OCMC executive staff determines the final permit stipulations, the permit will be released. The hold is to review the proposed work and set conditions for the work and/or restoration. Office hours: 8:30 AM-5:00 PM, Queens DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). 280 Broadway, 3rd Floor CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. Common examples include approval from the New York City Department of Parks and Recreation (Parks) if any street trees or tree pits will be affected by the proposed work; a permit from the New York City Department of Environmental Protection (DEP) if any water or sewer line will be affected; and a Certificate of Appropriateness from the New York City Landmarks Preservation Commission (LPC) if the proposed work is within an Historic District. The first and most expeditious option (see Diagram 2), is by using the DOT on-line NYCStreets Permit Management system. Cranes may require permits from DOB in addition to NYC DOT. Manuals and Standards. Applications for most permit types can be submitted to the Manhattan Central Permit Office. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Raising the base of the traffic signals or street light poles reduces the chance that the electrical components of the poles will be submerged in salt water during future flooding events. (212) 839-2475 WALKWAY IN CLOSED LANE. The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. DOB approval is also required. FULL WIDTH OF ROADWAY SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. MUST BE AN UNRESTRICTED PARKING LANE. The streets themselves also serve as public spaces, fostering social, economic and recreational activities. THE SIGN MUST BE PLACED AT A HEIGHT OF 7 TO 10 FEET AND STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF THE CLOSURE. MAINTAIN 5 FOOT PED. EAU will process the request and fax or call the applicant with an Emergency Street Opening Permit Number, which authorizes the emergency street opening/excavation work. 120-55 Queens Boulevard, 2nd floor Permit Bond. To release a VLT hold, the Permit Offices Plan Examination Unit must be contacted. Street work at Third Avenue and Saint Marks Place, Manhattan as part of a larger Cooper Square area reconstruction project. This category of permits applies to openings/excavations or other work in a street that may cause damage to the street surface or to any work that the Permit Office believes would compromise the street surface. Name, address and phone number of excavator, Brief description of the planned digging and excavation. Email: DOT.TrafficElectrical@ct.gov,
A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. For all permit applications including permit requests to work on embargoed streets through the HE period, the permittee will be automatically charged an additional $135 HE application review fee. Any foundation material not meeting specifications must be removed. SIGNS MUST BE POSTED AT WORK ZONES AS WELL AS BOTH INTERSECTIONS OF AFFECTED SIDEWALK. See Chapter 3Permits and Approvals for more information. Sub title REVISED DRAWINGS COVERING PEDESTRIAN RAMPS Agency Design and Construction, Department of (DDC) Additional creators DDC & DOT Subject Traffic Safety Transportation Streets and Highways Report type REQUEST TO DEP:LOCAL AND EMERGENCY TRAFFIC DURING WORKING HOURS DURING NON-WORKING HOURS ONE LANE OPENED TO TRAFFIC. PLACE LEFT LIGHTED ARROW BOARD 24/7 NE CORNER OF AMSTERDAM AVE/W.60 ST. NO IMPACT ON 4 TRAVEL LANES AT ANY TIME. Fax: (718) 298-7075, Staten Island (part-time office) To this end, the Street Works Manual is a resource for all parties that perform work in New York City streets, from utilities and contractors installing, replacing and repairing underground infrastructure to developers replacing roadways and sidewalks adjacent to building sites and homeowners performing their own sidewalk repairs. nyc.gov/dot. Attn: Forestry Upon a satisfactory inspection, the hold(s) will be released. Tel: (646) 252-5517 or (646) 252-5544, New York State Department of Transportation (NYSDOT) IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. WORK 11 PM TO 5 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. 4. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. It seems that JavaScript is not working in your browser. A permit is required for new sidewalk installation, repairs, and replacements. Permit windows at the central Permit Office. The NYCDOT Standard Details of Construction have been updated to include the revised H-1011 drawings covering pedestrian ramps. Department of Transportation For Further Information: Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. Original insurance certificates for Commercial General Liability (CGL) insurance and Worker's Compensation insurance. 30-30 Thomson Avenue, 4th Floor Clicking on the "i" button at the top center of the map will change the cursor into an arrow with an "i" next to it. Learn about ParkNYC. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply.
Mason Mount Phone Number,
Leonlite Led Replacement Bulbs,
Clear Plastic Fillable Easter Eggs,
Articles N